So let’s narrow it down…..

Our wiki site: (WIKI SITE) details all the specifics regarding our campaign.. within this we have narrowed down 3 main factors that have a strong influence on the possible solutions to the problem:

1. Feasibility of the Light Rail system as compared to other modes of Public Transport

2. Convenience and Comfort
3. Cost and Effectiveness

Now, this post is merely informative. Something to wet thy lips on before we delve into the nitty gritty of this campaign. These are the three points we want to look at regarding Randwick’s new Light Rail transport system, so let’s explore them…

Advertisements

About lightrail3005

We are a group focusing on the unresolved issue of introducing a light rail transport system to Randwick.
This entry was posted in Uncategorized. Bookmark the permalink.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s